| Task |
Description |
Comments |
Active |
|
|
|
|
|
|
| (OLD)Antenna |
Mounting ( Iridium, Globalstar, & Argos) |
Not Active |
|
|
| (OLD)Assembling Electronics Plate |
Assembly of Electronics & Sensors to ABS Plate |
Not Active |
|
|
| (OLD)assembling water filters |
assembling water filters |
Not Active |
|
|
| (OLD)Assembly |
Basic Hardware Assembly (NOT INCLUDING ELECTRONICS |
Not Active |
|
|
| (OLD)Batteries |
Battery stacking, change connectors, rewire |
Not Active |
|
|
| (OLD)Electronics |
Do not include soldering time. |
Not Active |
|
|
| (OLD)Watertraps |
Pipe cutting, tapping, etc. |
Not Active |
|
|
| 5 Ice Trackers 2015 |
5 Ice Trackers 2015 for Jeremy Casper |
|
|
|
| Administration |
Meetings, planning, etc. |
12/11/13 |
|
|
| Assembly |
Full Assembly of a product |
|
|
|
| Assembly - (Electronics) |
Only use when there are no other tasks available |
12/5/13 |
|
|
| Barometer |
Assemble Barometer and shield, cut tubing |
Not Active |
|
|
| Barometer - (Port,Assemble) |
Assemble Barometer and shield, cut tubing |
12/12/13 |
|
|
| Base Station |
Base Station Box Cable & Box |
Not Active |
|
|
| Battery - (Assembling) |
Assembling battery(wiring,welding) |
12/5/13 |
|
|
| Battery - (Assembly of wire harness) |
Assembly of wire harness |
12/10/13 |
|
|
| Battery - (Cutting out pipe) |
Cutting out pipe for battery |
1/17/14 |
|
|
| Battery - (inspecting for dents and scratches) |
inspecting for dents and scratches |
1/14/14 |
|
|
| Battery - (Pouring Urethane) |
Pouring Urethane in Battery |
12/5/13 |
|
|
| Battery - (Re-Do) |
Re-Do |
12/6/13 |
|
|
| Battery - (Testing) |
Running battery tests through laptop |
12/5/13 |
|
|
| Battery - (Welding) |
Battery - (Welding) |
|
|
|
| Battery-(Cutting out foam) |
cutting out foam for top and bottom plates |
1/14/14 |
|
|
| Bottom Rings |
Prepping, heating, bending & gluing bottom weighte |
Not Active |
|
|
| Boxing |
boxing up Product. |
Not Active |
|
|
| Boxing - (Building of boxes) |
cutting wood,taping, and assembling |
12/6/13 |
|
|
| Boxing - (Packaging of drifter) |
stretch wrapping, labeling,taping |
12/6/13 |
|
|
| Boxing - (Redo Packaging of drifter) |
Redo Packaging of drifter |
12/12/13 |
|
|
| Boxing- (cut wood) |
Boxing- (cut wood) |
|
|
|
| Checkouts |
Checkout for electronics (programming/coding) |
12/12/13 |
|
|
| Clean electronics |
after Soldering |
12/11/13 |
|
|
| Clean Up |
|
Not Active |
|
|
| Collecting Data |
Gathering information on Order Details from all so |
Not Active |
|
|
| Compass Calibration |
Calibration of a compass to a drifter |
12/6/13 |
|
|
| Confirming PO's |
Confirming PO's |
|
|
|
| Creating Order List |
Creating list of items needing ordering |
Not Active |
|
|
| Cutting Heatshrink |
|
Not Active |
|
|
| Cutting Pipe |
PVC or ABS Pipe |
Not Active |
|
|
| Cutting spiral sleeving |
|
Not Active |
|
|
| Cutting Wood |
cutting wood |
Not Active |
|
|
| Desiccant capsule - (assemble) |
assemble,drilling,and taping |
12/12/13 |
|
|
| Dissembling Electronics |
removing Electronics from drifter |
Not Active |
|
|
| Documenting Order Details |
Documenting ID#s Battery#s and other data into logs |
|
|
|
| Drill caps |
|
Not Active |
|
|
| Drill surface float |
|
Not Active |
|
|
| Drilling and installing vent hole |
vent hole for reclosable drifters |
|
|
|
| Drilling water filter |
drilling water filter case |
Not Active |
|
|
| Drogue |
Includes melting zippers & paper taping drogue and install middle & bottom rings |
Not Active |
|
|
| Drogue - (Handles) |
cutting out pipe and tying up rope |
12/6/13 |
|
|
| Drogue - (Installing Middle and Bottom rings) |
Installing Middle and Bottom rings |
12/6/13 |
|
|
| Drogue - (Installing Top Ring, Melting Zippers,and |
Installing Top Ring, Melting Zippers,and Paper Taping |
12/6/13 |
|
|
| Electronic Board- ( Removing U15 Chip) |
Electronic Board- ( Removing U15 Chip) |
|
|
|
| Electronic Plates (Installing Iridium Modem) |
Installing Iridium Modem |
|
|
|
| Electronics Plate - (installing Argos Antenna) |
Argos Antenna |
12/6/13 |
|
|
| Electronics Plate - (installing Argos Transmitter) |
Installing Argos Transmitter |
12/6/13 |
|
|
| Electronics Plate - (installing Barometer sensor) |
Installing Barometer sensor |
12/6/13 |
|
|
| Electronics Plate - (installing Globalstar Antenna |
installing Globalstar Antenna |
12/18/13 |
|
|
| Electronics Plate - (installing GPS Antenna) |
installing GPS Antenna |
12/18/13 |
|
|
| Electronics Plate - (installing Iridium Antenna) |
installing Iridium Antenna |
12/18/13 |
|
|
| Electronics Plate - (installing PG Main board) |
Installing PG Mainboard |
12/6/13 |
|
|
| Electronics Plate - (installing Standoffs) |
Installing Standoffs |
12/6/13 |
|
|
| Electronics Plate - (installing Wiring) |
wiring |
12/6/13 |
|
|
| Engineering Assistance |
Engineering |
|
|
|
| Epoxy |
|
Not Active |
|
|
| EZ-Access - (Gluing rings to surface float) |
Gluing rings to surface float |
12/6/13 |
|
|
| EZ-Access - (installing interthread) |
installing interthread |
12/16/13 |
|
|
| EZ-Access - (Tapping) |
Tapping before Gluing |
12/6/13 |
|
|
| EZ-Access - (Washing) |
Washing parts |
12/16/13 |
|
|
| Final Checkout |
Secure connections, write ID's on drifteres |
Not Active |
|
|
| Final Checkout Labels |
Assembly (cut tag down & place label on tag) |
Not Active |
|
|
| Fishbowl - (Starting/processing Order) |
Setup/processing of an Order in Fishbowl |
12/6/13 |
|
|
| Foam |
self explanatory |
Not Active |
|
|
| Glue |
Gluing anything other than the surface float |
Not Active |
|
|
| Glue in Electronics Plate |
Glue in Electronics Plate |
Not Active |
|
|
| Glue on Tethers |
Glue on Tethers to SVP Bottoms |
Not Active |
|
|
| Glue Surface Float |
Glue Surface float halves together |
Not Active |
|
|
| HWA-001 - (assembling) |
Drilling, sanding, gluing, |
12/12/13 |
|
|
| HWA-001 - (Epoxy) |
Mixing and poring Epoxy |
12/12/13 |
|
|
| Ice Trackers(Assembly) |
Assembly Ice Trackers |
1/17/14 |
|
|
| Ice Trackers(cutting out foam) |
cutting out foam |
1/10/14 |
|
|
| Ice Trackers(cutting pipe) |
cutting out pipe |
1/10/14 |
|
|
| Inputting Data |
|
Not Active |
|
|
| Inspecting Machine Parts |
Inspecting machine parts |
|
|
|
| Inspecting Parts |
Quality Checking Parts |
|
|
|
| Instructions - (Making) |
Making Power Point instructions |
12/6/13 |
|
|
| Inventory |
Counting parts |
Not Active |
|
|
| Inventory - (Counting) |
Counting parts |
12/11/13 |
|
|
| Inventory - (Inputting Inventory) |
Inputting Inventory in fishblow |
12/11/13 |
|
|
| Invoicing customers |
Invoicing customers |
12/11/13 |
|
|
| Jigs |
making of Jig /upgrades/improvements/ |
12/10/13 |
|
|
| Kitting |
Pull parts from inventory |
12/5/13 |
|
|
| Label/Instruction Making |
Label Making for Instructions & Drifters |
Not Active |
|
|
| Labeling,and Printing Instructions |
printing and labeling Instruction and labels |
12/11/13 |
|
|
| Labeling/Kitting PCB Components |
Labeling/Kitting PCB Components |
|
|
|
| Laptop - (Final Checkout) |
Checkout after satellite test & and before gluing of drifter |
12/12/13 |
|
|
| Laptop - (First Check) |
Laptop Check before foaming |
12/12/13 |
|
|
| Laptop - (second Check) |
second Check after foaming |
12/12/13 |
|
|
| Lead Weight |
Adding Weight or Balancing a drifter |
12/6/13 |
|
|
| Learning to assembly |
how to assembly |
|
|
|
| LOWS |
LOWS FOR PARTS |
|
|
|
| Magnet (Velcro) Assembly |
Magnet Velcro assembly |
|
|
|
| Magnet - (Calibration) |
Calibration of magnet with sponge out side of surface flout |
12/12/13 |
|
|
| Magnet - (Drilling, Tying Ribbon, and Sponge) |
Drilling,Cutting and Tying the Ribbon, Installing in Sponge |
12/6/13 |
|
|
| magnetic reed switch - (Testing ohms resistance) |
Testing ohms resistance |
12/6/13 |
|
|
| Magnetic switch |
testing or gluing magnetic switch |
Not Active |
|
|
| Marketing |
Social Media, creating brochures, labels, etc. |
12/6/13 |
|
|
| Meeting |
|
Not Active |
|
|
| meeting |
|
03/10/14 |
|
|
| Microstar - (Velcro for Battery Holders) |
Cutting Velcro & gluing |
12/6/13 |
|
|
| Microstar Drogue - (Drilling) |
drill hole for hindge pin |
12/6/13 |
|
|
| Microstar Drogue - (Gluing) |
Gluing Hinge & PVC Pieces onto Microstar Drogue |
12/12/13 |
|
|
| Microstar Drogue - (Taping Hinges) |
Taping Hinges before gluing |
12/6/13 |
|
|
| Microstar Drogue- (Cutting and washing pipe) |
Cutting and washing pipe |
|
|
|
| Microstar Drogue-(assemble) |
drouge assembly |
|
|
|
| Middle Rings |
Prepping, heating, bending, & gluing middle drogue |
Not Active |
|
|
| miscellenious |
misc. |
|
|
|
| Modification - (Electronics Plate) |
Drilling ,cutting,adding other parts |
12/11/13 |
|
|
| Modification - (Wire Harness) |
Cutting, adding crimps, heat shrinking,adding wire |
12/11/13 |
|
|
| Modification, (soldering Electronics board) |
Adding, removing,parts |
12/11/13 |
|
|
| Ordering Parts |
Ordering Materials needed for order |
12/6/13 |
|
|
| Ordering PCB Components |
Counting and Ordering PCB Components |
|
|
|
| Overhead |
Filing checkout sheets, PTT/Modem ID data entry, |
Not Active |
|
|
| Packaging Trackers |
|
|
|
|
| Paint Surface Float |
Paint Surface Float |
Not Active |
|
|
| Painting |
Painting |
Not Active |
|
|
| Parachute |
Parachute prepping and rigging |
12/6/13 |
|
|
| Paying, entering bills and filing |
Paying and entering bills for building and shop |
12/5/13 |
|
|
| Pictures |
Taking, Uploading or Organizing Pictures |
12/6/13 |
|
|
| Prep before test |
This includes any prep work required before satell |
Not Active |
|
|
| prep for satellite testing |
prep for satellite testing out side |
1/3/14 |
|
|
| Program - (Barometer) |
Programming Barometer |
12/6/13 |
|
|
| Program - (GPS) |
Program GPS |
12/18/13 |
|
|
| Program - (Modem) |
Program Modem |
12/6/13 |
|
|
| Program - (PG Board) |
Program PG Board |
12/6/13 |
|
|
| Program - (Transmitter) |
Program Transmitter |
12/6/13 |
|
|
| Program - (UBlox) |
Programming the UBlox daughter board |
12/6/13 |
|
|
| Pull-Off Magnet |
Microstar On/off magnets |
Not Active |
|
|
| Quotes |
Time for checking inventory to expedite orders |
12/5/13 |
|
|
| R&D |
research and development |
|
|
|
| Re-do (electronics) |
Applies to dis-assembly of any kind, re-solder, re |
12/6/13 |
|
|
| Re-do (Inventory) |
re-do inventory |
Not Active |
|
|
| Re-do (Kitting) |
Involves all kitting when any adjustments or updat |
12/6/13 |
|
|
| Re-do (mechanical) |
Applies to drilling holes or any mishaps |
12/6/13 |
|
|
| Re-do (Program) |
any re-programming |
12/5/13 |
|
|
| Re-do - (Battery) |
battery |
Not Active |
|
|
| Receiving |
Receiving, Stocking Parts and Adding Inventory |
12/6/13 |
|
|
| Reducer |
prepping, drilling & beveling |
Not Active |
|
|
| Restocking |
restocking |
2/11/14 |
|
|
| Reviewing BOM, Starting/Fulfilling Order |
Reviewing BOM, Starting/Fulfilling Order |
1/9/2013 |
|
|
| Ring / Bottom / Cutting pipe |
Cutting out pipe |
12/6/13 |
|
|
| Ring / Bottom / Installing Rebar |
Installing Rebar |
12/6/13 |
|
|
| Ring / Middle / Cutting pipe |
Cutting out pipe |
12/6/13 |
|
|
| Ring / Middle / heating and bending / gluing |
heating and bending pipe and gluing one side of coupling |
12/6/13 |
|
|
| Ring / Top / Cutting heatshrink |
Cutting out Heatshrink |
12/6/13 |
|
|
| Ring / Top / Cutting Pipe |
Cutting out pipe |
12/6/13 |
|
|
| Ring / Top / Gluing on Coupling |
Gluing on Coupling |
12/6/13 |
|
|
| Ring / Top / Heating and bending pipe |
heating and bending pipe |
12/6/13 |
|
|
| Ring / Top / Installing O ring and heat shrink, |
Installing O ring and heat shrink |
12/6/13 |
|
|
| Salinity sensors - (Painting) |
Painting salinity sensor all parts |
12/6/13 |
|
|
| Salinity sensors - (Washing) |
washing sensors after testing in salt water |
12/6/13 |
|
|
| Sanding Caps |
|
Not Active |
|
|
| Sea Test |
Testing at sea |
2/13/14 |
|
|
| Sealing EZ-Access |
Greasing O-ring, Screw EZ-Access ring shut |
Not Active |
|
|
| Shipping |
Shipping docs, etc. |
12/6/13 |
|
|
| Shop - (Clean up) |
Swiping, dusting,wiping down tables |
12/12/13 |
|
|
| Shop - (Organizing) |
Moving boxes, |
12/12/13 |
|
|
| shop meeting |
shop meeting |
2/25/14 |
|
|
| Solder Batteries |
solder wiring, cables, leads, etc to battery packs |
Not Active |
|
|
| Soldering |
Soldering of any type |
12/6/13 |
|
|
| Soldering Display |
Soldering Display to Circuit board |
|
|
|
| Sorting I"D #'s |
Sorting I'D Numbers |
12/12/13 |
|
|
| Sorting pictures (P-drive) |
Sorting pictures (P-drive) |
|
|
|
| Sorting Transmitter |
Sorting Transmitter |
Not Active |
|
|
| Spider |
|
Not Active |
|
|
| Spider - (Assemble Spider) |
Assemble Spider |
12/6/13 |
|
|
| Spider - (Cut out heat shrink) |
Cut out heat shrink |
12/6/13 |
|
|
| Spider - (Cut out Space lay, and crimping) |
Cut out Space lay 5 or 6 feet long |
12/6/13 |
|
|
| Spider - (Cut out Vacuum hose) |
Cut out Vacuum hose |
12/6/13 |
|
|
| Spider - (Drilling Reducers) |
Drilling Reducers |
12/6/13 |
|
|
| Spider - (Hook up Spider to top ring) |
Hook up Spider to top ring |
12/6/13 |
|
|
| Spider - (Pour Epoxy) |
Pour Epoxy, in Reducer |
12/6/13 |
|
|
| Spider - (taping up and heat shrink Nicopress) |
Sealing up and heat shrink Nicopress |
12/6/13 |
|
|
| Spider- (Drill Caps) |
Spider- (Drill Caps) |
|
|
|
| Spider-(cutting pipe) |
Spider-(cutting pipe) |
|
|
|
| Strap Hanger Drogue |
ASSEMBLING DROGUES |
12/6/13 |
|
|
| Super Caps |
Assembling Super Caps |
12/6/13 |
|
|
| Surface Float |
|
Not Active |
|
|
| Surface Float - (All Thread) |
All Thread |
12/6/13 |
|
|
| Surface Float - (Drilling) |
Drilling |
12/6/13 |
|
|
| Surface Float - (Foaming) |
Foaming the in side of Surface float |
12/6/13 |
|
|
| Surface Float - (Glue in Electronics plate) |
Glue in Electronics plate |
12/6/13 |
|
|
| Surface Float - (Glue on tether) |
Glue on tether |
12/6/13 |
|
|
| Surface Float - (Glue surface float together) |
Glue surface float together |
12/6/13 |
|
|
| Surface Float - (Hook up wires) |
Hook up wires |
12/6/13 |
|
|
| Surface Float - (Install Barometer port) |
Installing Barometer port |
12/12/13 |
|
|
| Surface Float - (Install battery, and plates) |
Install battery, and plates |
12/6/13 |
|
|
| Surface Float - (Install HWA-001) |
Install HWA-001 |
12/6/13 |
|
|
| Surface Float - (Install Magnetic reed switch) |
Install Magnetic reed switch |
12/6/13 |
|
|
| Surface Float - (Install Thermister) |
Install Thermister |
12/6/13 |
|
|
| Surface Float - (Install water trap) |
install water trap |
12/12/13 |
|
|
| Surface Float - (Installing Desiccant capsule) |
Installing Desiccant capsule |
12/6/13 |
|
|
| Surface Float - (installing strain gauge) ) |
Surface Float - (installing strain gauge) |
|
|
|
| Surface Float - (Painting) |
Painting |
12/6/13 |
|
|
| Surface Float - (Submersive screws) |
adding Submersive screws |
1/24/14 |
|
|
| Surface Float - (Taping) |
Taping |
12/6/13 |
|
|
| Surface Float - (Vacuum Testing) |
Checking for air leaks |
12/6/13 |
|
|
| Surface Float Adapter assembly |
surface float adapter assembly |
|
|
|
| Surface Float Adapter- Gluing |
surafce float adapter gluing |
|
|
|
| Surface Float Assembly |
Assembly (all thread, electronics plate, Batt Plat |
Not Active |
|
|
| Surface Float- (Pour epoxy) |
Surface Float- (Pour Epoxy) |
|
|
|
| Surface Flout - (gluing salinity sensor hardware) |
gluing salinity sensor hardware to Surface Float |
12/12/13 |
|
|
| Surface flout - (gluing salinity sensor cage) |
Glue salinity sensor cage on to surface float |
12/12/13 |
|
|
| Surfacefloat-(customize bottom float) |
customize bottom support of float |
|
|
|
| surfacefloat-(glue on led) |
glue on led |
|
|
|
| T-pod (Pressure Tank Testing) |
T-pod (Pressure Tank Testing) |
|
|
|
| T-pods - ( assembly ) |
assembly of T-pod |
12/13/13 |
|
|
| T-pods - ( Programming ) |
Programming |
12/12/13 |
|
|
| T-pods - (Hookup to tether) |
Hookup to tether |
12/13/13 |
|
|
| Taking a nap |
Taking a nap |
|
|
|
| Tank Testing |
Testing Drifters in the Temperature Tank |
12/6/13 |
|
|
| Taping reclosable rings |
|
Not Active |
|
|
| Taping surface floats |
|
Not Active |
|
|
| Test - (Antennas) |
Test Antennas |
12/6/13 |
|
|
| Test - (wire harness) |
Making test harnesses & cables |
12/6/13 |
|
|
| Test batteries |
|
Not Active |
|
|
| Test- (Strain Gauge) |
Strain Gauge - (testing) |
2/11/14 |
|
|
| Testing |
Testing |
|
|
|
| Testing drifter at sea |
Testing drifter at sea |
2/20/14 |
|
|
| Tether - (Assemble Tether) |
crimping, gluing, eye bolts |
12/6/13 |
|
|
| Tether - (Cut out Sonotube) |
Cut out Sonotube |
12/6/13 |
|
|
| Tether - (Cut out Space lay and wrapping space lay |
Cut out space lay, and wrapping space lay to Sonotube |
12/6/13 |
|
|
| Tether - (Drill out caps and cut out pipe) |
Drill out caps and cut out pipe |
12/6/13 |
|
|
| Tether - (pouring Epoxy and urethane) |
pouring Epoxy and urethane |
12/6/13 |
|
|
| Tether - (washing Pipe) |
washing ABS pipe |
12/11/13 |
|
|
| Tether assembly |
assembling tether |
Not Active |
|
|
| Tether Wrapping |
paper tape tether |
Not Active |
|
|
| Tether, (Stripping of spacelay) |
Stripping out side of spacelay |
12/11/13 |
|
|
| Tether, Stripping of spacelay |
Stripping of spacelay |
Not Active |
|
|
| Thermistor - (Calibration) |
Calibration of Thermistor after tank testing |
12/11/13 |
|
|
| Time sheets |
|
12/6/13 |
|
|
| Top Rings |
Prepping, heating, bending, & gluing top rings |
Not Active |
|
|
| Training |
|
Not Active |
|
|
| training |
training for job |
|
|
|
| Transmitter, Programing |
Program Transmitter |
Not Active |
|
|
| Transmitter, Reset |
Reset Transmitter |
12/12/13 |
|
|
| Transmitters |
Transmitter programing |
Not Active |
|
|
| Travel |
Travel time |
|
|
|
| Troubleshooting |
malfunctioning electronic boards, wires, cables, e |
Not Active |
|
|
| Undo & glue Inside Ring |
Drogues delivered that weren't complete (inside ri |
Not Active |
|
|
| urethane |
pouring urethane |
Not Active |
|
|
| Vacuum Test |
Checking for air leaks |
Not Active |
|
|
| Washing/Drying Machine parts |
Washing Machine Parts |
|
|
|
| Water Filter - (Assembly) |
Assembly |
12/6/13 |
|
|
| Water Filter - (Drilling) |
Drilling case |
12/6/13 |
|
|
| Water Filter- Boxing |
Boxing of Water Filters |
|
|
|
| Water filters - (testing for leaks) |
make sure the water filters don't leak |
12/6/13 |
|
|
| Water Trap - (Adding desiccant) |
Adding desiccant |
12/12/13 |
|
|
| Water Trap - (Assembling) |
Assembling |
12/12/13 |
|
|
| Welding Tabs |
Prepping and welding tabs |
Not Active |
|
|
| Windsonic Installation |
Install windsonic to surface float |
12/6/13 |
|
|
| Wiring - (assembling) |
making up wiring harness |
12/13/13 |
|
|
| Wiring - (repair) |
repair wiring |
1/8/14 |
|
|